Uninterruptible Power Supply Reports

Intelligent Power Protector
sponsored by Eaton
SOFTWARE DEMO: Download this exclusive protection software demo offered from Eaton Corporation at no charge, designed to enable you to avoid data loss by gracefully shutting down computers and servesrs powered by an Eaton UPS in the event of an extended power outage.
Posted: 09 Jun 2014 | Premiered: 09 Jun 2014

Eaton

Planning and Design for a Data Centre Electrical Power Infrastructure: Distribution, UPS, Safety and Savings
sponsored by SOCOMEC Group
WHITE PAPER: This paper examines that a data centre design  must meet specific requirements including; site selection, space, available power, air conditioning, load, environmental quality, and risk evaluation, but also the requirements of the electrical power supply system. It is also discusses how necessary it is to consider the cost of service downtime.
Posted: 15 Feb 2011 | Published: 15 Feb 2011

SOCOMEC Group

InfraStruxure for Small IT Spaces at Schneider Electric
sponsored by Schneider Electric
VIDEOCAST: Access this video to discover a comprehensive solution that brings together UPS, power distribution and cooling offerings to help you manage small data centres, IT rooms, enterprise branches or network closets. This video outlines a solution that uses virtualisation, unified communication and cloud technologies to simplify these environments.
Posted: 05 Nov 2012 | Premiered: Nov 5, 2012

Schneider Electric

Best Practices in Protecting the Technology Systems Revolutionizing Healthcare
sponsored by Emerson Network Power
WHITE PAPER: With technology infiltrating every aspect of healthcare, traditional approaches to power protection no longer suffice. This paper introduces a new hospital power protection model that leverages technologies and best practices forged in the data center.
Posted: 08 Aug 2013 | Published: 07 Jul 2009

Emerson Network Power

E-Guide: Key Grounding and Voltage Considerations In the Data Center
sponsored by Schneider Electric
EGUIDE: This e-guide explains the reasons for implementing grounding methods and the problems that can occur if it is done incorrectly. Find out how to design your data center’s power system with key components in mind and how much power to implement in your data center.
Posted: 31 Jan 2011 | Published: 28 Jan 2011

Schneider Electric

VA vs. Watts: Demystifying Sizing and Ratings
sponsored by Eaton
WEBCAST: In this brief on-demand webcast, you will examine the difference between VA and watts, and what this difference means in terms of data center power management. Tune in now to discover why this distinction is critical in helping you correctly size your UPS.
Posted: 17 Jan 2014 | Premiered: Jan 17, 2014

Eaton

Liebert Battery Monitoring and Testing Solutions
sponsored by Liebert Corporation
PRODUCT OVERVIEW: Liebert monitoring solutions deliver increased visibility and control of critical support systems for single modules, entire data centers or all critical facilities in an enterprise.
Posted: 20 Feb 2008 | Published: 01 Feb 2008

Liebert Corporation

How Monitoring Systems Reduce Human Error in Distributed Server Rooms and Remote Wiring Closets
sponsored by Schneider Electric
WHITE PAPER: Surprise incidences of downtime in server rooms and remote wiring closets lead to sleepless nights for many IT managers. This paper analyzes several of these incidents and makes recommendations for how a basic monitoring system can help reduce the occurrence of these unanticipated events.
Posted: 26 Jan 2011 | Published: 26 Jan 2011

Schneider Electric

UPS MIB Test Suite Specification
sponsored by InterWorking Labs, Inc.
PRODUCT LITERATURE: Design engineers, product developers, software quality engineers and testers use the UPS MIB Test Suite to find and fix bugs in their UPS MIB product implementations.
Posted: 09 May 2004 | Published: 06 May 2004

TOPICS:  MIB | Testing | UPS
InterWorking Labs, Inc.

Loading Considerations when Paralleling Transformers
sponsored by Schneider Electric
WHITE PAPER: Access this resource to explore the limiting conditions of connecting transformers in parallel and loading considerations when turn ratios, impedances and kVA ratings are different.
Posted: 21 Nov 2011 | Published: 01 Oct 2011

Schneider Electric